Westminster Tower
Conversion of a riverside office tower by Lambeth Bridge, stripping and reinstating the façade and adding new floors on top.
- Homes
- 28
- Location
- Albert Embankment
- Type
- Office conversion and extension
- Our role
- Programme, Project Execution Plan, Construction Management Plan and site logistics
What had to be planned
- Planned removal of the façade and its reinstatement on the building
- Sequenced additional floors on top of the existing structure
- Worked around new highway and junction works directly outside the building
- Agreed scaffolding and servicing arrangements with neighbours, including options from the rear
- Engaged extensively with the local highways authority to make the programme deliverable

Planning documents on this scheme
Construction Programmes
Tender, contract and working programmes with a critical path you can defend.
View service PEPsProject Execution Plans
One document that sets out how the project will be delivered, by whom and when.
View service CMPs & CEMPsCMPs and CEMPs
Construction Management and Construction Environmental Management Plans that discharge planning conditions.
View service LogisticsSite Logistics Plans
Phased logistics drawings that show how the site works at every stage.
View serviceMore on construction planning in Central London and refurbishment, retrofit and fit-out.

Bugsby's Way
Delivery strategy for a proposed multi-phase scheme built over the car park of a trading IKEA store, where parking had to stay live throughout.

Nine Elms Park
756 homes over a basement, with London Underground tunnels beneath, an old gas holder and a masterplan full of competing access rights.

St Michael's
Two towers of 23 and 20 storeys with a basement on a postage-stamp site between the bus station, the railway station and the tram line.