Apartments and Higher-Risk Buildings construction planning
Apartment schemes bring frames, façades, cranes and hoists, and buildings of 18m or seven storeys and above in England now carry the Building Safety Act gateway regime. We build realistic Building Safety Regulator determination periods and the golden thread into the plan from day one.
The pressure points we plan around
- Gateway 2 approval before work starts, and Gateway 3 before occupation
- Change control for design changes during construction
- Frame, envelope and façade sequencing
- Crane, hoist and loading bay logistics on constrained sites
- Golden thread information handover
Documents we produce for apartments & hrbs projects
We prepare construction programmes, Project Execution Plans, Construction Management Plans, CEMPs and phased site logistics plans, written for the realities of apartments and higher-risk buildings rather than adapted from a generic template.
Our services for apartments and higher-risk buildings
Construction Programmes
Tender, contract and working programmes with a critical path you can defend.
PEPsProject Execution Plans
One document that sets out how the project will be delivered, by whom and when.
CMPs & CEMPsCMPs and CEMPs
Construction Management and Construction Environmental Management Plans that discharge planning conditions.
LogisticsSite Logistics Plans
Phased logistics drawings that show how the site works at every stage.
Apartments and Higher-Risk Buildings projects across the UK
London
Tight sites, busy streets and some of the most detailed construction logistics requirements in the country.
ENGLAND · 9 AREASSouth East
Commuter-belt housing, town centre regeneration and constrained sites around the M25.
ENGLAND · 6 AREASEast of England
Our home region, with strong housing growth across Hertfordshire, Essex, Cambridgeshire and beyond.
ENGLAND · 7 AREASSouth West
From Bristol city centre to coastal and rural sites across Devon and Cornwall.
ENGLAND · 6 AREASWest Midlands
Regeneration across Birmingham and the Black Country alongside growth in the shire counties.
ENGLAND · 6 AREASEast Midlands
Major logistics and industrial growth along the M1, with city regeneration in Nottingham, Leicester and Derby.
ENGLAND · 5 AREASNorth West
Tall buildings in Manchester and Liverpool, and housing and industrial growth across the region.
ENGLAND · 4 AREASYorkshire and the Humber
City centre growth in Leeds and Sheffield, heritage settings in York and industrial land along the Humber.
ENGLAND · 4 AREASNorth East
Regeneration on Tyneside and Teesside, with housing and industrial growth across the region.
SCOTLAND · 10 AREASScotland
Programmes and plans written for the Scottish planning and building standards system.
WALES · 7 AREASWales
Programmes and plans written for Welsh planning policy and building regulations.
NORTHERN IRELAND · 8 AREASNorthern Ireland
Programmes and plans written for Northern Ireland's own regulations.
Apartments and Higher-Risk Buildings our team has planned

Bugsby's Way
Delivery strategy for a proposed multi-phase scheme built over the car park of a trading IKEA store, where parking had to stay live throughout.

Nine Elms Park
756 homes over a basement, with London Underground tunnels beneath, an old gas holder and a masterplan full of competing access rights.

St Michael's
Two towers of 23 and 20 storeys with a basement on a postage-stamp site between the bus station, the railway station and the tram line.

Lea Bridge Station
Three island sites around a very busy junction next to Lea Bridge station, including a new station entrance.

White City
Over 2,000 homes above a basement covering the whole site, with a new cantilevered bridge over the open-cut Central line near Wood Lane station.

Holloway Prison
Redevelopment of the former Holloway Prison, a sloping site with semi-basements throughout and extensive demolition.