Construction Programmes
A programme is the plan everyone signs up to. We build logic-linked programmes from enabling works to handover, show the real critical path, and keep them current as the job moves.
Quotes within one working dayFixed feesUK-wide
What's included
- Pre-construction and tender programmes for bids and funding
- Contract and baseline programmes logic-linked to the critical path
- Design, procurement and lead-in schedules tied to site dates
- Short-term look-aheads for site teams
- Progress updates, earned-value style reporting and recovery options
- Independent programme reviews for funders, clients and monitoring surveyors
When you need it
- You are pricing a tender and need a credible duration
- A funder or monitoring surveyor wants a programme they can test
- The job is slipping and you need to see where and why
- You need regulatory periods, such as Building Safety Regulator approvals, built in properly
What you receive
Native Asta Powerproject or Microsoft Project files, PDF Gantt charts with the critical path marked, and a short narrative setting out the key assumptions, sequence and risks.
Turnaround
Tender programmes typically within a week of receiving drawings and scope.
From brief to approved document.
Brief
Send drawings, the planning decision notice and the condition wording. We confirm scope, fee and timescale in writing within one working day.
Draft
We prepare the programme, plan or drawings and flag the assumptions and risks we have made.
Review
We walk you through it, take comments from your team and revise.
Issue
You receive final native files and PDFs. For CMPs we stay on through council comments until the condition is discharged.
Frequently asked
Which software do you use?
We work in Asta Powerproject and Microsoft Project, and can export to PDF and Excel. If your team or client needs a particular format, tell us at the start.
How long does a programme take to produce?
A tender programme for a typical low-rise scheme usually takes a few days once we have the drawings and scope. Larger or phased schemes take longer, and we agree the timescale when we quote.
Can you review a contractor's programme?
Yes. We check logic, durations, float and the critical path, then report what is realistic and where the risks sit.
Across every sector
- Housing Developments
- Apartments and Higher-Risk Buildings
- Schools and Education
- Offices and Commercial
- Healthcare
- Industrial and Warehousing
- Retail and Leisure
- Student Housing and Co-living
- Later Living and Care
- Refurbishment, Retrofit and Fit-out
Across the UK
- Programmes in London
- Programmes in South East
- Programmes in East of England
- Programmes in South West
- Programmes in West Midlands
- Programmes in East Midlands
- Programmes in North West
- Programmes in Yorkshire and the Humber
- Programmes in North East
- Programmes in Scotland
- Programmes in Wales
- Programmes in Northern Ireland
Where our team has done this before

Bugsby's Way
Delivery strategy for a proposed multi-phase scheme built over the car park of a trading IKEA store, where parking had to stay live throughout.

Nine Elms Park
756 homes over a basement, with London Underground tunnels beneath, an old gas holder and a masterplan full of competing access rights.

St Michael's
Two towers of 23 and 20 storeys with a basement on a postage-stamp site between the bus station, the railway station and the tram line.
Read more on this
How the Building Safety Regulator has changed construction planning
Higher-risk buildings now have hard regulatory hold points before work starts, during construction and before occupation. Here is what that means for programmes, logistics and PEPs.
Read the guideBuilding Gateway 2 and Gateway 3 into your programme
A practical guide to showing the building control gateways in a construction programme, with realistic durations and the decisions that sit behind them.
Read the guideDischarging pre-commencement conditions without losing your start date
Pre-commencement conditions are one of the most common causes of a delayed start. How to plan their discharge into the programme.
Read the guideOften needed together
Project Execution Plans
One document that sets out how the project will be delivered, by whom and when.
CMPs & CEMPsCMPs and CEMPs
Construction Management and Construction Environmental Management Plans that discharge planning conditions.
LogisticsSite Logistics Plans
Phased logistics drawings that show how the site works at every stage.