Demolition and Construction Management Plans
Where a site has buildings to clear, councils often want a combined Demolition and Construction Management Plan. It covers the extra risks of demolition, including asbestos, noise, vibration and dust, as well as the construction stage that follows.
Quotes within one working dayFixed feesUK-wide
What's included
- Demolition sequence and method
- Asbestos survey and removal arrangements
- Utility disconnections and service diversions
- Noise and vibration controls and monitoring
- Dust suppression and air quality measures
- Hoarding, access and neighbour protection
- Construction stage arrangements following demolition
When you need it
- Your permission requires a demolition and construction management plan
- Existing buildings must be cleared before the new build starts
- Neighbouring buildings are close and vibration is a concern
What you receive
A combined DCMP in Word and PDF with logistics drawings for the demolition and construction stages.
Turnaround
Typically 1 to 2 weeks. Council review time is separate.
From brief to approved document.
Brief
Send drawings, the planning decision notice and the condition wording. We confirm scope, fee and timescale in writing within one working day.
Draft
We prepare the programme, plan or drawings and flag the assumptions and risks we have made.
Review
We walk you through it, take comments from your team and revise.
Issue
You receive final native files and PDFs. For CMPs we stay on through council comments until the condition is discharged.
Frequently asked
Do I need to notify the council before demolition?
In England and Wales, most demolition needs notice to the local authority under section 80 of the Building Act 1984, separate from the planning condition. We flag this in the plan and programme.
Do you arrange the asbestos survey?
No. A refurbishment and demolition asbestos survey must be carried out by a specialist. We use its findings in the plan and programme.
Often needed together
CMPs and CEMPs
Construction Management and Construction Environmental Management Plans that discharge planning conditions.
CTMPConstruction Traffic Management Plans
Routes, vehicle sizes, delivery times and traffic controls, set out to satisfy the highway authority.
CLPConstruction Logistics Plans
Outline and detailed Construction Logistics Plans in line with Transport for London guidance.