Logistics

Site Logistics Plans

A good logistics plan answers practical questions before they cost money on site: where the gate goes, where the crane sits, where materials are stored, how deliveries arrive and how people walk safely. We draw it phase by phase so it changes as the building does.

Quotes within one working dayFixed feesUK-wide

Site logistics plan · Phase 2Example drawing
Example site logistics plan, phase 2: hoarding and gates, two tower cranes, scaffold, hoists, Haki stairs, pit lane offloading zone, swept path, welfare, laydown and pedestrian routesEXISTING RETAILRESIDENTIALEXISTING RESIDENTIALSTATION ROAD · RED ROUTEMILL LANEMATERIALSLAYDOWNMORTAR SILOWASTE SKIPSWELFARE & OFFICESTC1R62MTC2R35MBLOCK APhase 1 · fit-outBLOCK BPhase 2 · frame L5–9PROPOSED PIT LANE /OFFLOADING ZONE 07:30–16:00VEHICLE ACCESS & EGRESSTRAFFIC MARSHALLSIN ATTENDANCEPHASE 2UNDER CONSTRUCTIONTWIN HOISTSINGLE HOISTTC1 IN LIFT SHAFTOPERATIVE ACCESSSEGREGATED WALKWAYHOARDED WELFARE ZONEENTRY VIA TURNSTILETELEHANDLER ROUTE TOLAYDOWN, SILO AND SKIPSSCAFFOLD GANTRY OVERNEIGHBOUR ACCESSTC1 OVERSAILS RETAIL ROOFOVERSAIL AGREEMENTOVERLAPPING RADIIANTI-COLLISION ZONINGTC2 SET HIGHERNO LIFTS OVER FOOTWAYSLEW RESTRICTION ZONEONE-WAY ROUTE THROUGHSITE · TELEHANDLERVEHICLE DETAILSTelehandlerW 2.3mLock 17°02040mNKEY2.4m solid hoardingSite boundaryTower crane and radiusScaffold outlineSingle hoistTwin hoistHaki stairPit lane double leaf gateTurnstileArticulated vehicle offloadingSwept path, telehandlerPedestrian routeMaterials laydownMortar siloWaste skipTITLELogistics proposalPhase 2 · frame levelREV02DRAWING NO.VCP-LP-002SCALE1:400 @ A1STATUSFor CMPPREPARED BYVerulam Construction Planning

What's included

  • Site set-up and phased logistics drawings
  • Hoarding, gates, welfare and office locations
  • Crane, hoist and plant positions with radius and loading checks
  • Delivery routes, unloading bays and laydown areas
  • Pedestrian and vehicle segregation
  • Temporary works and services interfaces
  • Logistics input to tenders, CMPs and Construction Phase Plans

When you need it

  • The site is tight, overlooked or next to a live road
  • You need logistics drawings for a CMP or CLP submission
  • You are bidding and want to show how you will run the site
  • The site moves through phases and the set-up has to change with it

What you receive

Phased logistics drawings in PDF and DWG where required, with a short narrative explaining each stage.

Turnaround

Typically within a week for a single phase.

How it works

From brief to approved document.

  1. Brief

    Send drawings, the planning decision notice and the condition wording. We confirm scope, fee and timescale in writing within one working day.

  2. Draft

    We prepare the programme, plan or drawings and flag the assumptions and risks we have made.

  3. Review

    We walk you through it, take comments from your team and revise.

  4. Issue

    You receive final native files and PDFs. For CMPs we stay on through council comments until the condition is discharged.

Questions

Frequently asked

Do you need to visit the site?

Not always. For many schemes we work from drawings, surveys and street-level imagery. For tight or complex sites we arrange a visit.

Can logistics plans be used in a tender?

Yes. A clear phased logistics plan is one of the strongest ways to show a client you have thought the job through.

Do you cover crane and hoist selection?

We position and check cranes and hoists for coverage and logistics. Final selection, base design and lifting plans sit with the supplier and temporary works designer.